Search by Municipality

Search Alphabetically

Search by Keyword

  • Municipality State
  • Municipality State
  • Municipality State

Search Results for City Of Chicago

City of Chicago Vacant Buildings Registration Ordinance
Date Added: Saturday, April 15, 2017
Vacant & Distressed Properties    
Illinois
Municipal
The city of Chicago, Illinois, enacted an ordinance requiring owners of vacant buildings to perform several tasks within 30 days of the building’s vacancy. These tasks include: enclosing and securing the building; posting a sign on the building providing the owner’s and his or her agent’s contact information; acquiring substantial liability insurance for the building and; registering the vacant building with the Department of Buildings. This registration last for six months and costs $250. If the building remains vacant at the end of the si.. Read More

City of Chicago Rooftop Solar PV System Application Process; Solar Zoning
Date Added: Saturday, January 6, 2018
Solar Energy, Zoning    
Illinois
Municipal
The City of Chicago has made installation of both small rooftop solar PV systems (<13.44kw) and large rooftop solar PV systems (those generating greater than 13.44kw) easier than ever before by easing restrictions and streamlining processes, saving time and design costs. Applicants for small rooftop systems can now access the City’s Easy Permit Process (EPP) where qualifying projects can receive same-day permit approvals at reduced fees. For projects that meet the Easy Permit Process (EPP) requirements, the permitting process was cut down from .. Read More